Additional pipelines and storage tanks will be necessary for Firestone's overall ability to receive the water treated at the St. Vrain Water Treatment Plant.
Pipelines
Distribution pipelines are needed to carry treated water from the St. Vrain Water Treatment Plant to connection points in Firestone's distribution system.
- 2020: Phase 1 preliminary and final design
- 2021: Phase 1 bidding and construction
- 2022: Phase 1 construction completed
- 2023: Phase 1 pipeline in service
- 2026: Phase 2 design and construction
Storage Tanks
Storage tanks are used to expand system capacity for demand during peak usage times, stabilize the system's pressure, and provide emergency supplies when needed.
- 2024: design and construction