Water Meters

New Water Meter Installation Requests

Developers who are ready for water meter installation should complete the form below. If the form does not display, you can access it directly at: https://firestoneco.form.transform.civicplus.com/49669.

Pre-Installation Requirements

The first page of the form includes a pre-installation checklist. All items must be completed and compliant with the Town of Firestone Construction Standards & Specifications before submitting the request.

If any damage is found to the required components during inspection, the meter will not be installed. A follow-up inspection will be scheduled, and a $75 return trip fee (progressively increasing for each offense) will be charged. This fee must be paid in full before the installer returns to set the meter.

Additional Information

Please note that this process is separate from the construction inspection process.

  • The Town of Firestone Construction Inspector will inspect the construction of the meter pit.
  • The Firestone Water Department will re-inspect the pit at the time of meter installation to ensure no damage occurred between construction and installation.
  • A final inspection will be conducted at TCO/CO to confirm that the pit has not been damaged after the meter was set.

To avoid delays and additional fees, please ensure the meter pit is protected after each inspection.

For questions or additional information, please contact: watermeters@firestoneco.gov or 720-508-4127.